Period kitchens and baths

A working kitchen or bath in an old house, with the original trim and layout kept where they can be.

Old houses were not built for dishwashers and walk-in showers, and the walls hide what the builders did. We plan a kitchen or bath around the house: its joists, its chimney, its original windows. Cabinets are built or fitted to suit the room, and the plaster, floors and trim around them are repaired, not replaced.

  • What we don't do

    We don't remove a bearing wall without an engineer's drawing, and we don't build to a catalog layout the house can't hold.

What's included

  • A layout drawn around the house's structure

  • Plaster, floors and trim repaired and kept

  • Electrical and plumbing by the trades we work with, under permit

  • Cabinets built or fitted to suit the room

  • Tile, counters and fixtures chosen to suit the period

Butcher block counter and a white farmhouse sink under two double-hung windows

Pricing

What changes the cost

We print no figures. These are the things that move the number.

  • Size and layout moves

    Moving a sink or a wall changes the work more than changing the cabinets.

  • Wiring and plumbing

    Old pipes and cloth wiring behind the wall may have to be replaced, and you find out when it's opened.

  • What's behind the walls

    A sagging floor or a hidden flue shows up with the first cut.

  • Cabinets and counters

    Stock, custom or salvaged cost differently, and have different lead times.

  • Permits and inspections

    Building, electrical and plumbing permits each have their own steps.

The work, in order

How the work goes

  1. Step 1: Measure and draw

    We measure the room and draw the layout around the structure.

  2. Step 2: Open with care

    Plaster and trim come off carefully, so they can go back.

  3. Step 3: Rough-in and inspection

    Framing, wiring and plumbing go in, and the inspector looks before anything closes.

  4. Step 4: Plaster, trim and floors

    The room is closed up and repaired to match the rest of the house.

  5. Step 5: Cabinets and fixtures

    Cabinets, counters, tile and fixtures go in last.

  6. Step 6: Walk-through

    We check each drawer, door and valve with you.

Permits and rules

  • Permits

    Building, electrical and plumbing permits apply to most kitchens and baths. We say which ones, and who pulls each.

  • Houses built before 1978

    Opening walls and removing old finishes is covered work under the EPA's rule for older houses. It sets how we protect the rest of the house.

  • Historic districts

    Interior work is rarely reviewed, but an exterior change, a new vent or a window, can be.

Questions about this work

Can I keep my old kitchen windows?

Usually yes, and we plan the room around them. We'd rather move the sink than lose the window.

How long does a bath take?

It depends on what the walls hold. We give a range of weeks with the estimate and update it if we find something.

Do you design the room?

We draw the layout. If you want a designer's eye on finishes, we work with yours or suggest one.

Tell us about the house

A house visit is the first step. We write down what we see before we talk about a price.